Setting Block Studio (SMD Ventures LLC)
Release news
Notes about the public software. This page does not show a subscriber count.
Current public status
October 2026. The site describes center-set storefront design references for the lines on the homepage, a free calculator, and a fictional sample package in PDF, DXF, and Excel. Checking the software on real drawings is still open. The homepage first look is a 55-second preview of the public calculator and a separate sample drawing, using fictional examples and still captures.
Get occasional development and release updates. Confirm your email, and unsubscribe any time. You are not subscribed until you confirm the message. This page does not show whether an address is pending or confirmed. A stopped address stays stopped until a confirmation sent to that address is used.
First look at Setting Block Studio
14 October 2026, Honolulu.
What you can open today: the free calculator, a fictional sample package, a silent 55-second first look, the shop-drawing guide, and the approved handoff kit.
Setting Block Studio is a clearer path from a storefront opening you enter to a drawing package. The public examples are fictional design references. They are not a customer project. They do not approve engineering, fabrication, or ordering. Real-job checks and human workflow acceptance are still open.
The first look is a silent 55-second preview on the homepage. It uses still captures of the public calculator with fictional examples, then a separate sample drawing. Review dimensions and connections before fabrication.
The approved storefront handoff kit is six document files for internal use by one business: an opening-intake workbook (XLSX), a handoff-tracker workbook (XLSX), a checklist (DOCX), a checklist (PDF), a README, and the buyer terms. The approved price announced for that kit is 29 US dollars, one time. The kit does not include the drawing software, software access, an engineering review, or other services. Current terms and availability are on the kit page.
When field-measured openings and architectural dimensions disagree, what do you send back to the GC before drawings start: a marked-up elevation, an open-items list, or an RFI? That question is open on the public X discussion. Leave out confidential project details.
Free storefront calculator · Fictional sample in PDF, DXF, and Excel · Silent 55-second first look · Shop-drawing guide · Storefront handoff kit · Current terms · Refunds · Field-measure discussion on X · Release news RSS